Maritime QuestionsEngineering / Technical

Before carrying out maintenance on a pump or piece of electrical equipment that has been switched off, what is the purpose of a "permit to work" and isolation/lock-off procedure?

A. It only applies to work carried out by shore contractors, not the ship's own crew
B. It is just a formality to satisfy paperwork requirements and has no practical safety function
C. A permit to work is only required for jobs expected to take longer than 8 hours
D. It ensures the equipment is positively isolated from its energy source (electrical, mechanical, hydraulic, or pneumatic), locked or tagged so it cannot be inadvertently re-started or re-energised by someone else while work is in progress, and confirms the person doing the work understands the hazards and controls before starting — this protects against the equipment unexpectedly starting or becoming live while hands or tools are inside it
Sign in or create a free account to see the answer and explanation.
You're draining a thermal oil system that was running normally a short time ago. Before opening the drain point, what should you confirm?
A. Only that the pump has been switched off
B. That the engine logbook has been updated first
C. Nothing extra — thermal oil drains are routine and can be opened immediately
D. That the system has cooled and depressurised, and you are positioned clear of the drain point's discharge path
Sign in or create a free account to see the answer and explanation.
A thermal oil system has been contaminated and needs draining for cleaning. The written procedure tells you to open the drain valve but doesn't specify a cooling-down period or PPE. What should you do?
A. Treat the gap as a hazard in its own right: apply a suitable cooling/depressurising period and full PPE before proceeding, and raise the procedure gap with the Chief Engineer
B. Delegate the task to a junior rating without further briefing, since the procedure covers it
C. Skip the task until a class surveyor is on board
D. Follow the procedure exactly as written — if it doesn't mention cooling or PPE, they're not required
Sign in or create a free account to see the answer and explanation.
+248 more Engineering / Technical questions available

Create a free account to practise all 251 questions, track your accuracy, and build your Reputation Score.

Create Free Account