Maritime Questions › Engineering / Technical
What recommendation did Transport Malta make regarding the root cause of the failed elbow?
A. That Anglo-Eastern Ship Management (NL) BV investigate the level of vibration in the lube oil pipe elbow and take corrective action if needed
B. That the vessel's classification society be changed
C. That the engine manufacturer redesign the entire lubrication system
D. No recommendations were made, as the failure was ruled unforeseeable
Sign in or create a free account to see the answer and explanation.
A. Only that the pump has been switched off
B. That the engine logbook has been updated first
C. Nothing extra — thermal oil drains are routine and can be opened immediately
D. That the system has cooled and depressurised, and you are positioned clear of the drain point's discharge path
Sign in or create a free account to see the answer and explanation.
A. Treat the gap as a hazard in its own right: apply a suitable cooling/depressurising period and full PPE before proceeding, and raise the procedure gap with the Chief Engineer
B. Delegate the task to a junior rating without further briefing, since the procedure covers it
C. Skip the task until a class surveyor is on board
D. Follow the procedure exactly as written — if it doesn't mention cooling or PPE, they're not required
Sign in or create a free account to see the answer and explanation.
+248 more Engineering / Technical questions available
Create a free account to practise all 251 questions, track your accuracy, and build your Reputation Score.
Create Free Account