Maritime Questions › Engineering / Technical
What is the safest first step before carrying out electrical maintenance or repair work on board?
A. Confirm the work can be completed within a single short session
B. Isolate the electrical supply and confirm lock-out/tag-out before starting work
C. Brief the bridge team on the expected duration of the task
D. Check the manufacturer's manual for the component being repaired
Sign in or create a free account to see the answer and explanation.
A. Only that the pump has been switched off
B. That the engine logbook has been updated first
C. Nothing extra — thermal oil drains are routine and can be opened immediately
D. That the system has cooled and depressurised, and you are positioned clear of the drain point's discharge path
Sign in or create a free account to see the answer and explanation.
A. Treat the gap as a hazard in its own right: apply a suitable cooling/depressurising period and full PPE before proceeding, and raise the procedure gap with the Chief Engineer
B. Delegate the task to a junior rating without further briefing, since the procedure covers it
C. Skip the task until a class surveyor is on board
D. Follow the procedure exactly as written — if it doesn't mention cooling or PPE, they're not required
Sign in or create a free account to see the answer and explanation.
+248 more Engineering / Technical questions available
Create a free account to practise all 251 questions, track your accuracy, and build your Reputation Score.
Create Free Account