Maritime Questions › Electrical Ums Master

Transiting a narrow channel at 10 knots, your main engine fails. You have 2nm to the nearest shoal. Describe your response in order of priority.

A. Wait for the chief engineer to diagnose and fix the engine failure before taking any navigational action. Anchoring should not be done in a narrow channel.
B. ENGINE FAILURE IN NARROW CHANNEL — MASTER's RESPONSE: TIME AVAILABLE: at 10 knots, 2nm takes approximately 12 minutes to cover. This is the time window for action. IMMEDIATE ACTIONS (first 60 seconds): (1) MASTER TO BRIDGE: whoever is on watch — call the master immediately if not already on the bridge; (2) HELM: attempt to steer using engine. If engine is dead — no ability to alter course with rudder at low speed (no flow over rudder). Consider bow thruster if fitted; (3) ENGINE ROOM: telegraph STOP (already failed). Call chief engineer — "ENGINE FAILURE — NEED IMMEDIATE POWER RESTORATION"; (4) BROADCAST: PAN PAN on VHF 16 and VTS frequency — vessel name, position, engine failure in [channel name], drifting; (5) ANCHOR: immediately assess anchorage possibility. What is the depth? What is the sea bottom? Can an anchor hold in time? With 12 minutes — preparation can begin immediately. If depth is suitable (chain can reach), consider dropping anchor now to reduce drift rate; (6) TIDAL STREAM ASSESSMENT: which direction is the vessel drifting? With or against? Current may carry the vessel toward or away from the shoal; SUBSEQUENT ACTIONS: (7) TUG: VHF VTS — request emergency tug assistance. Is there a tug in the area? Can it reach in 12 minutes? (likely not — but VTS can arrange); (8) ENGINE ROOM: attempt hot restart — chief engineer decision on whether restart is possible; (9) COLLISION AVOIDANCE: NUC signals. Other vessels in the channel must be aware; (10) CHART ASSESSMENT: is there deeper water to drift into? Can the vessel be allowed to drift into a safer area by deliberate heading management with bow thruster?
C. Send a MAYDAY immediately. Any engine failure in a narrow channel constitutes immediate danger to life.
D. Apply full helm to try to steer the vessel clear of the shoal using water flow across the rudder. Speed gives more steering.
Sign in or create a free account to see the answer and explanation.
Your vessel has a UMS (Unattended Machinery Space) notation. At 0200 a UMS alarm activates on the bridge. As Officer of the Watch, describe your response, and what does the master need to ensure is in place for UMS operations?
A. The alarm is a false alarm until confirmed otherwise. Continue the watch and reset the alarm. Engineers should not be disturbed for unconfirmed alarms.
B. A UMS alarm at 0200 is routine. Acknowledge the alarm and log it. The engineer will attend during their morning rounds.
C. Leave the bridge and attend the engine room yourself to assess the alarm. The OOW has authority to investigate any alarm on the vessel.
D. UMS ALARM RESPONSE AND MASTER's UMS OBLIGATIONS: SOLAS REGULATION II-1/46-54 (UMS REQUIREMENTS): UMS notation means the engine room can be operated without a watchkeeper present during normal operations. Requirements include: (a) Automatic alarm systems for all critical machinery; (b) Bridge control systems; (c) Adequate fire detection and fixed fire suppression; (d) Periodic rounds by the duty engineer at intervals (typically 30-60 minutes as per SMS); (e) ENGINEER ON CALL: the duty engineer must be immediately available and must respond to alarms within a defined time (typically 10 minutes to the engine room); UMS ALARM AT 0200 — OOW RESPONSE: (1) ASSESS THE ALARM: identify which alarm — high temperature, low pressure, overload, flooding alarm. Each has different urgency. Check alarm panel for source; (2) WAKE THE DUTY ENGINEER: immediately. The duty engineer responds to all UMS alarms. The OOW does not go to the engine room — their station is the bridge; (3) CALL THE MASTER: UMS alarms at 0200 = call the master as per standing orders. The master determines the response level; (4) MAINTAIN SAFE NAVIGATION: the OOW remains on the bridge. Do not compromise bridge watchkeeping for an engine room alarm — you cannot manage both; (5) MONITOR THE ALARM: note the time, the alarm type, the action taken; MASTER's UMS REQUIREMENTS: the master must ensure: (a) UMS standing orders are in place specifying which alarms require immediate master notification; (b) Engineer on-call duty roster is maintained; (c) SMS procedures for UMS operations are followed; (d) UMS audits are conducted and recorded; (e) The manual for UMS operations is available.
Sign in or create a free account to see the answer and explanation.
Your vessel uses high-voltage (6.6kV) electrical systems for bow thrusters. A crew member without electrical certification asks to work near the high-voltage switchboard. What are your obligations?
A. HIGH VOLTAGE ELECTRICAL SAFETY — MASTER's OBLIGATIONS: HIGH VOLTAGE ON MODERN VESSELS: modern large vessels (container ships, LNG carriers, cruise ships) frequently use high-voltage distribution systems (3.3kV, 6.6kV, or 11kV) for large motors (thrusters, pumps, compressors). SOLAS II-1 and IEC 60092 standards govern the installation. CRITICAL SAFETY PRINCIPLE — HIGH VOLTAGE: high voltage (defined as >1000V AC or >1500V DC) can cause: (a) Electrocution — very fast (40mA through the heart is lethal at 6.6kV); (b) Arc flash — potentially hundreds of kilojoules of energy in milliseconds, causing severe burns, blindness, hearing damage; (c) Blast injuries; COMPETENCE REQUIREMENT: work on or near high-voltage electrical systems requires: (a) STCW Regulation III/1 (Electro-Technical Officer — ETO) or equivalent electrical certification; (b) Company-specific HV permit to work (PTW) system; (c) Approved Electrician qualification (typically national electrical certification); (d) HV safety training (IET/UK standards or equivalent); MASTER's OBLIGATION: (1) DO NOT PERMIT uncertified crew to work near HV switchboards — this is an absolute prohibition; (2) ISOLATION FIRST: high-voltage circuits must be isolated, locked off, and tested dead (LOTO — Lock Out Tag Out) before any work can be done near them; (3) PTW MANDATORY: a comprehensive Permit to Work is required for any HV electrical work; (4) ONLY QUALIFIED PERSONS: ETO, Chief Engineer with HV certification, or a shore specialist approved by the company; (5) SAFE DISTANCE: even near an energised HV switchboard — non-qualified persons must be kept at a safe distance (minimum approach distance per IEC standards varies — typically 300mm for 6.6kV).
B. Any crew member can work near high-voltage switchboards provided they wear rubber gloves and rubber-soled shoes.
C. High voltage systems are the chief engineer's responsibility. The master has no obligation regarding who works on or near electrical systems.
D. Crew members with general electrical awareness training can assist near high-voltage systems under the supervision of the ETO.
Sign in or create a free account to see the answer and explanation.
+7 more Electrical Ums Master questions available

Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.

Create Free Account