At sea in a TSS, your vessel suffers a complete blackout — all main and auxiliary generators have tripped. You have no propulsion or steering. What are your immediate priorities?

A. COMPLETE BLACKOUT IN TSS — MASTER's PRIORITIES: IMMEDIATE (0-60 SECONDS): (1) CONFIRM BLACKOUT: bridge has no power — check emergency lighting is on (confirms emergency generator started); (2) HELM: wheel will be dead. Emergency steering (manual or emergency hydraulic) must be activated — but with no propulsion, heading is controlled only by anchor; (3) VHF 16 ON EMERGENCY POWER: confirm GMDSS operating on emergency power. Send URGENCY (PAN PAN) broadcast on VHF 16: vessel name, position, blackout, no propulsion/steering in TSS — warning to all shipping; (4) SOUND SIGNALS: a vessel not under command (NUC) sounds the appropriate fog signal if in restricted visibility. In daylight — hoist NUC signals (2 black balls/day; 2 all-round red lights/night) as required by COLREGs Rule 27; (5) ANCHOR ASSESSMENT: is the water shallow enough to anchor? What is the TSS depth? Anchoring in a TSS may prevent collision with approaching traffic — if water depth permits; (6) VTS NOTIFICATION: call the TSS VTS/MRCC immediately. They can warn traffic and coordinate; ENGINE ROOM ACTIONS (chief engineer): (1) Identify the cause of the blackout; (2) Restore generator power — start standby generator; (3) Reconnect essential services: steering, propulsion; (4) Notify bridge when power is restored; RECOVERY — MINUTES 1-10: once power is restored — vessel is NUC until propulsion is proven. Maintain NUC lights/signals until underway. Log every event with timestamps.
B. Wait for the chief engineer to restore power before taking any action on the bridge. The engine room manages blackout recovery — the bridge waits.
C. Reduce speed. With no propulsion, the vessel will decelerate naturally. Collision risk is minimal as the vessel is visible on other vessels' radar.
D. Abandon ship. A blackout with no propulsion in a TSS is an unrecoverable emergency requiring immediate evacuation.
Sign in or create a free account to see the answer and explanation.
Your vessel has a UMS (Unattended Machinery Space) notation. At 0200 a UMS alarm activates on the bridge. As Officer of the Watch, describe your response, and what does the master need to ensure is in place for UMS operations?
A. UMS ALARM RESPONSE AND MASTER's UMS OBLIGATIONS: SOLAS REGULATION II-1/46-54 (UMS REQUIREMENTS): UMS notation means the engine room can be operated without a watchkeeper present during normal operations. Requirements include: (a) Automatic alarm systems for all critical machinery; (b) Bridge control systems; (c) Adequate fire detection and fixed fire suppression; (d) Periodic rounds by the duty engineer at intervals (typically 30-60 minutes as per SMS); (e) ENGINEER ON CALL: the duty engineer must be immediately available and must respond to alarms within a defined time (typically 10 minutes to the engine room); UMS ALARM AT 0200 — OOW RESPONSE: (1) ASSESS THE ALARM: identify which alarm — high temperature, low pressure, overload, flooding alarm. Each has different urgency. Check alarm panel for source; (2) WAKE THE DUTY ENGINEER: immediately. The duty engineer responds to all UMS alarms. The OOW does not go to the engine room — their station is the bridge; (3) CALL THE MASTER: UMS alarms at 0200 = call the master as per standing orders. The master determines the response level; (4) MAINTAIN SAFE NAVIGATION: the OOW remains on the bridge. Do not compromise bridge watchkeeping for an engine room alarm — you cannot manage both; (5) MONITOR THE ALARM: note the time, the alarm type, the action taken; MASTER's UMS REQUIREMENTS: the master must ensure: (a) UMS standing orders are in place specifying which alarms require immediate master notification; (b) Engineer on-call duty roster is maintained; (c) SMS procedures for UMS operations are followed; (d) UMS audits are conducted and recorded; (e) The manual for UMS operations is available.
B. A UMS alarm at 0200 is routine. Acknowledge the alarm and log it. The engineer will attend during their morning rounds.
C. Leave the bridge and attend the engine room yourself to assess the alarm. The OOW has authority to investigate any alarm on the vessel.
D. The alarm is a false alarm until confirmed otherwise. Continue the watch and reset the alarm. Engineers should not be disturbed for unconfirmed alarms.
Sign in or create a free account to see the answer and explanation.
Your vessel uses high-voltage (6.6kV) electrical systems for bow thrusters. A crew member without electrical certification asks to work near the high-voltage switchboard. What are your obligations?
A. HIGH VOLTAGE ELECTRICAL SAFETY — MASTER's OBLIGATIONS: HIGH VOLTAGE ON MODERN VESSELS: modern large vessels (container ships, LNG carriers, cruise ships) frequently use high-voltage distribution systems (3.3kV, 6.6kV, or 11kV) for large motors (thrusters, pumps, compressors). SOLAS II-1 and IEC 60092 standards govern the installation. CRITICAL SAFETY PRINCIPLE — HIGH VOLTAGE: high voltage (defined as >1000V AC or >1500V DC) can cause: (a) Electrocution — very fast (40mA through the heart is lethal at 6.6kV); (b) Arc flash — potentially hundreds of kilojoules of energy in milliseconds, causing severe burns, blindness, hearing damage; (c) Blast injuries; COMPETENCE REQUIREMENT: work on or near high-voltage electrical systems requires: (a) STCW Regulation III/1 (Electro-Technical Officer — ETO) or equivalent electrical certification; (b) Company-specific HV permit to work (PTW) system; (c) Approved Electrician qualification (typically national electrical certification); (d) HV safety training (IET/UK standards or equivalent); MASTER's OBLIGATION: (1) DO NOT PERMIT uncertified crew to work near HV switchboards — this is an absolute prohibition; (2) ISOLATION FIRST: high-voltage circuits must be isolated, locked off, and tested dead (LOTO — Lock Out Tag Out) before any work can be done near them; (3) PTW MANDATORY: a comprehensive Permit to Work is required for any HV electrical work; (4) ONLY QUALIFIED PERSONS: ETO, Chief Engineer with HV certification, or a shore specialist approved by the company; (5) SAFE DISTANCE: even near an energised HV switchboard — non-qualified persons must be kept at a safe distance (minimum approach distance per IEC standards varies — typically 300mm for 6.6kV).
B. Any crew member can work near high-voltage switchboards provided they wear rubber gloves and rubber-soled shoes.
C. High voltage systems are the chief engineer's responsibility. The master has no obligation regarding who works on or near electrical systems.
D. Crew members with general electrical awareness training can assist near high-voltage systems under the supervision of the ETO.
Sign in or create a free account to see the answer and explanation.
+7 more Electrical Ums Master questions available