Maritime QuestionsDP — What-If (Master/C-O)

Following a 12m position excursion during a pipe-lay operation, the investigation team asks the DPO on watch which position reference was the DP system's primary weighted input at the time of the incident. The DPO is unsure — the watch handover did not specify this and the DP logbook shows no reference configuration entries. What does this reveal about the pre-incident watchkeeping standard, and what systemic gap must be addressed?

A. This is only a concern on DP3 vessels where reference system documentation is mandatory
B. The information can be reconstructed from the DP system's black box data and the DPO's uncertainty is not a concern
C. This reveals that the DPO was not actively monitoring or recording the reference system configuration — a fundamental watchkeeping responsibility. The gap is in both DP logbook standards (reference configuration must be recorded at defined intervals) and watch handover quality (reference weighting and status must be communicated). Without this data, the investigation cannot determine whether the excursion was caused by a reference failure or a control system response
D. The DP system automatically manages reference weighting and this information is not expected to be known by the DPO
Sign in or create a free account to see the answer and explanation.
Your DP2 vessel needs to open the bus tie before commencing DP field operations. The chief engineer advises it will take 45 minutes to complete a power rebalance and safely open the bus. The vessel manager calls and says the client is furious about the delay — can the master just approve operating on closed bus 'briefly' inside the field? As master, what is the correct decision?
A. Approve it with the condition that it is documented in the DP logbook as a controlled deviation
B. Approve the closed bus operation — a 45-minute delay causes significant commercial harm and the risk is manageable
C. Seek the vessel manager's written approval before deciding — the decision is above the master's authority
D. Decline to approve closed bus DP operations inside the field. The 45-minute delay is a scheduling cost; a common cause failure on closed bus inside the field is a safety event with consequences potentially including total loss of DP, collision with the installation, and environmental damage. Commercial pressure is not a safety justification. The master's accountability to the ISM Code and the SMS cannot be commercially overridden
Sign in or create a free account to see the answer and explanation.
Reviewing the DP operations file, you discover that the last three-day operation completed yesterday had no formal ASOG signed by the client and master — the DPOs were working to verbal limits agreed informally between the lead DPO and the installation rep. As chief officer, what are your responsibilities in this situation?
A. Verbal ASOG limits agreed with the installation representative are acceptable under IMCA M109
B. Prepare a retroactive ASOG dated from the start of the operation to close the documentation gap
C. If the operation completed without incident, there's no further action required — the verbal limits clearly worked
D. Report the finding to the master, raise it through the SMS non-conformity process, and ensure a formal ASOG is in place before the next DP operation. The absence of a signed ASOG means the operation ran without the agreed, documented limits that protect the vessel, client, and crew — if an incident had occurred, liability and insurance implications would have been significant. Completing without incident does not mean the risk was acceptable
Sign in or create a free account to see the answer and explanation.
+5 more DP — What-If (Master/C-O) questions available

Create a free account to practise all 8 questions, track your accuracy, and build your Reputation Score.