You're DPO on a DP2 diving support vessel with divers at 55m depth. Wind is 26 knots, ASOG yellow limit is 28 knots, red abort limit is 32 knots. The forecast shows the wind building to 35 knots within 90 minutes. The dive supervisor has 25 minutes left in the planned dive and asks if you can confirm the vessel will hold for that time. What should you tell the dive supervisor and what should you do?
A. Confirm the vessel can hold — 26 knots is below the yellow limit and the forecast is still 90 minutes away
B. Tell the dive supervisor to surface immediately — any forecast of deteriorating conditions requires immediate abort
C. Inform the dive supervisor that you are currently Green but a forecast deterioration will likely bring conditions to ASOG yellow within 60-75 minutes — the dive team should factor this into their decision on whether to surface now or continue. Simultaneously inform the master of the forecast and the dive status. Do not wait for the yellow alarm to trigger before giving the dive team the information they need to make a safe ascent decision
D. Wait for the ASOG yellow alarm before informing the dive supervisor — this is the established threshold for action
Sign in or create a free account to see the answer and explanation.
A. A single thruster shutdown is permitted at any time without reassessment on a DP2 vessel
B. None — if the thruster was not contributing thrust, it was not part of the redundancy calculation
C. The risk is limited to reduced manoeuvrability in manual mode only
D. Shutting down a thruster changes the Worst Case Failure and may remove the vessel from DP2 compliance — the remaining thruster configuration must now be consequence-tested to confirm DP2 capability is maintained, and the ASOG status must be reassessed before operations continue
Sign in or create a free account to see the answer and explanation.
A. With two diverging DGNSS units and no third reference, you cannot determine which is correct. Immediately inform the master, assess whether operations can safely continue with degraded reference confidence, and consider whether an additional reference source (taut wire, radar range/bearing, another DGNSS unit) can be deployed or activated before the divergence worsens
B. Accept the average of the two positions as the reference and continue operations
C. Accept whichever unit was installed more recently as it is likely more accurate
D. Continue operations — a 4.2m divergence is within normal GPS accuracy tolerance
Sign in or create a free account to see the answer and explanation.
+6 more DP — What-If (DPO) questions available
Create a free account to practise all 9 questions, track your accuracy, and build your Reputation Score.
Create Free Account