Maritime Questions › DP — What-If (DPO)
You've just arrived on the offshore field and are preparing to enter DP. The chief engineer calls and says he'd like to stay on closed bus for another two hours to complete a switchboard load test — he'll open the bus before you get into the risk zone, probably. You need to enter the field and approach the installation. What is your response?
A. The bus must be in open configuration before you enter DP operations near the installation. "Probably open before the risk zone" is not an acceptable operating condition — a common cause failure that takes out both power sections while you're still approaching is a scenario the whole DP2 concept is designed to prevent. Coordinate with the chief engineer to open the bus now, or delay the approach until the switchboard test is complete
B. Log the closed bus status in the DP logbook and proceed — the documentation protects the DPO
C. Proceed on closed bus — the risk zone is still 3 miles away and the risk is low during the approach
D. Agree — two hours is enough time to complete the approach before entering the risk zone
Sign in or create a free account to see the answer and explanation.
A. A single thruster shutdown is permitted at any time without reassessment on a DP2 vessel
B. None — if the thruster was not contributing thrust, it was not part of the redundancy calculation
C. The risk is limited to reduced manoeuvrability in manual mode only
D. Shutting down a thruster changes the Worst Case Failure and may remove the vessel from DP2 compliance — the remaining thruster configuration must now be consequence-tested to confirm DP2 capability is maintained, and the ASOG status must be reassessed before operations continue
Sign in or create a free account to see the answer and explanation.
A. With two diverging DGNSS units and no third reference, you cannot determine which is correct. Immediately inform the master, assess whether operations can safely continue with degraded reference confidence, and consider whether an additional reference source (taut wire, radar range/bearing, another DGNSS unit) can be deployed or activated before the divergence worsens
B. Accept the average of the two positions as the reference and continue operations
C. Accept whichever unit was installed more recently as it is likely more accurate
D. Continue operations — a 4.2m divergence is within normal GPS accuracy tolerance
Sign in or create a free account to see the answer and explanation.
+6 more DP — What-If (DPO) questions available
Create a free account to practise all 9 questions, track your accuracy, and build your Reputation Score.