Maritime Questions › DP — Operations
A DPO is approaching the end of a 12-hour DP watch in heavy weather. He has managed several position excursions during the watch and is exhausted. The incoming DPO is delayed by 45 minutes due to a medical issue on board. The master asks the current DPO to extend for an additional hour. What should the fatigued DPO do?
A. Accept the extension — fatigue is part of the job in an emergency and the DPO should push through
B. Reduce alert levels on the DP system so fewer alarms need to be managed during the extension period
C. Accept the extension but make no entries in the DP logbook to avoid creating an hours-of-rest record issue
D. Report the fatigue condition honestly to the master. The master must either relieve the DPO promptly, provide a qualified backup, or assess whether the DP operation should be suspended pending a proper watch relief. A fatigued DPO is a direct threat to operational safety — the DPO reporting this is not weakness, it is a required professional act
Sign in or create a free account to see the answer and explanation.
A. The ASOG translates general vessel DP capability into specific, agreed criteria for a particular operation and worksite — weather limits, reference system minimums, thruster requirements, and alert zones. It is developed jointly by the vessel operator and the client/installation authority for each specific operation
B. The ASOG sets the DPO's watch schedule and handover procedures and is produced by the master alone
C. The ASOG is the same as the DP Consequence Analysis test and is produced by the DP system automatically before each operation
D. The ASOG is a standard document issued by IMCA that applies to all DP vessels equally and requires no vessel-specific customisation
Sign in or create a free account to see the answer and explanation.
A. The colour system refers to the number of active thrusters — green is all thrusters working, yellow is one thruster failed, red is two thrusters failed
B. Green/Yellow/Red refers to the sea state only — green is calm, yellow is moderate, red is severe
C. Green/Yellow/Red is a client-specific system used only on drilling vessels and does not apply to construction or diving support vessels
D. Green means operations can continue normally within all ASOG limits; Yellow means a limiting parameter has been reached or a degradation has occurred and the DPO must assess whether to continue — typically with master informed; Red means the abort criteria have been met and operations must stop or disconnect immediately
Sign in or create a free account to see the answer and explanation.
+17 more DP — Operations questions available
Create a free account to practise all 20 questions, track your accuracy, and build your Reputation Score.
Create Free Account