Maritime Questions › DP — Operations
A DPO on watch observes a rapid weather deterioration that, in her judgement, is about to breach the ASOG red abort limit. The master is not immediately reachable and the worksite supervisor is on the radio saying "hold on, just a few more minutes." The ASOG limit is breached. Does the DPO have the authority to initiate the abort sequence without first obtaining the master's approval?
A. Yes — when the ASOG red abort criteria are met, the DPO has both the authority and the professional duty to initiate the abort sequence immediately, without waiting for the master or the worksite supervisor. The master must be informed as quickly as possible, but the abort does not wait for approval
B. The DPO should initiate the abort only if the vessel has already exceeded the red limit by more than 5 knots
C. The DPO should initiate a partial abort only — reducing thruster demand but not disconnecting until the master is reached
D. No — only the master can authorise an emergency disconnect; the DPO must wait for authorisation regardless of conditions
Sign in or create a free account to see the answer and explanation.
A. The ASOG translates general vessel DP capability into specific, agreed criteria for a particular operation and worksite — weather limits, reference system minimums, thruster requirements, and alert zones. It is developed jointly by the vessel operator and the client/installation authority for each specific operation
B. The ASOG sets the DPO's watch schedule and handover procedures and is produced by the master alone
C. The ASOG is the same as the DP Consequence Analysis test and is produced by the DP system automatically before each operation
D. The ASOG is a standard document issued by IMCA that applies to all DP vessels equally and requires no vessel-specific customisation
Sign in or create a free account to see the answer and explanation.
A. The colour system refers to the number of active thrusters — green is all thrusters working, yellow is one thruster failed, red is two thrusters failed
B. Green/Yellow/Red refers to the sea state only — green is calm, yellow is moderate, red is severe
C. Green/Yellow/Red is a client-specific system used only on drilling vessels and does not apply to construction or diving support vessels
D. Green means operations can continue normally within all ASOG limits; Yellow means a limiting parameter has been reached or a degradation has occurred and the DPO must assess whether to continue — typically with master informed; Red means the abort criteria have been met and operations must stop or disconnect immediately
Sign in or create a free account to see the answer and explanation.
+17 more DP — Operations questions available
Create a free account to practise all 20 questions, track your accuracy, and build your Reputation Score.
Create Free Account