Maritime Questions › DP — Operations
An incoming DPO discovers during handover that one of the two DGNSS position reference systems has been showing intermittent dropouts for the past 90 minutes, and the Fanbeam unit is showing reduced confidence due to condensation on the reflector. No one has informed the master. The outgoing DPO says it's "been like this all watch and it's fine." What should the incoming DPO do before accepting the watch?
A. Refuse to accept the watch until the degraded reference status has been reported to the master and the ASOG status has been formally reassessed in light of the degraded position reference configuration
B. Accept the watch and resolve the reference issues independently during the watch without involving the master
C. Accept the watch but log the reference issues in the DP logbook as a precaution
D. Accept the watch since the outgoing DPO has already assessed the situation and deemed it safe
Sign in or create a free account to see the answer and explanation.
A. The ASOG translates general vessel DP capability into specific, agreed criteria for a particular operation and worksite — weather limits, reference system minimums, thruster requirements, and alert zones. It is developed jointly by the vessel operator and the client/installation authority for each specific operation
B. The ASOG sets the DPO's watch schedule and handover procedures and is produced by the master alone
C. The ASOG is the same as the DP Consequence Analysis test and is produced by the DP system automatically before each operation
D. The ASOG is a standard document issued by IMCA that applies to all DP vessels equally and requires no vessel-specific customisation
Sign in or create a free account to see the answer and explanation.
A. The colour system refers to the number of active thrusters — green is all thrusters working, yellow is one thruster failed, red is two thrusters failed
B. Green/Yellow/Red refers to the sea state only — green is calm, yellow is moderate, red is severe
C. Green/Yellow/Red is a client-specific system used only on drilling vessels and does not apply to construction or diving support vessels
D. Green means operations can continue normally within all ASOG limits; Yellow means a limiting parameter has been reached or a degradation has occurred and the DPO must assess whether to continue — typically with master informed; Red means the abort criteria have been met and operations must stop or disconnect immediately
Sign in or create a free account to see the answer and explanation.
+17 more DP — Operations questions available
Create a free account to practise all 20 questions, track your accuracy, and build your Reputation Score.
Create Free Account