Maritime Questions › DP — Operations
A DP2 offshore support vessel is arriving at a busy installation field. The deck team is eager to start work and the installation manager advises there is a weather window closing. The lead DPO has been asked to expedite the pre-DP setup. Which pre-operation step is the one that cannot be shortened or skipped under any schedule pressure?
A. Verifying that all reference systems are operational, checking gyro agreement, confirming ASOG criteria with the client, and completing the consequence analysis test before placing the vessel in a risk-elevated position — these steps confirm the vessel is actually capable of the operation it is about to perform
B. The daily DP equipment check, which can be deferred until after the weather window closes
C. The client field arrival notification, which can be done after setup begins
D. The vessel logbook entry recording the DP setup time
Sign in or create a free account to see the answer and explanation.
A. The ASOG translates general vessel DP capability into specific, agreed criteria for a particular operation and worksite — weather limits, reference system minimums, thruster requirements, and alert zones. It is developed jointly by the vessel operator and the client/installation authority for each specific operation
B. The ASOG sets the DPO's watch schedule and handover procedures and is produced by the master alone
C. The ASOG is the same as the DP Consequence Analysis test and is produced by the DP system automatically before each operation
D. The ASOG is a standard document issued by IMCA that applies to all DP vessels equally and requires no vessel-specific customisation
Sign in or create a free account to see the answer and explanation.
A. The colour system refers to the number of active thrusters — green is all thrusters working, yellow is one thruster failed, red is two thrusters failed
B. Green/Yellow/Red refers to the sea state only — green is calm, yellow is moderate, red is severe
C. Green/Yellow/Red is a client-specific system used only on drilling vessels and does not apply to construction or diving support vessels
D. Green means operations can continue normally within all ASOG limits; Yellow means a limiting parameter has been reached or a degradation has occurred and the DPO must assess whether to continue — typically with master informed; Red means the abort criteria have been met and operations must stop or disconnect immediately
Sign in or create a free account to see the answer and explanation.
+17 more DP — Operations questions available
Create a free account to practise all 20 questions, track your accuracy, and build your Reputation Score.
Create Free Account