A DP2 offshore installation vessel has a capability plot that shows it can maintain position in 32 knots from ahead (bow-on to weather) but only 18 knots from directly astern. The forecast for the operation is SW 24 knots, and the planned worksite heading puts the vessel broadside-on to the wind. What should the DPO and master do with this information?
A. The capability plot shows the vessel's capability is heading-dependent. The DPO and master should assess whether turning the vessel into the weather (bow-on) is operationally possible at this worksite, which would provide a 32-knot capability and significant margin over the 24-knot forecast
B. The capability plot minimum (18 knots astern) is the limiting value — since the forecast (24 knots) exceeds this, operations cannot proceed in any heading
C. Since the forecast is between the minimum and maximum capability values, no heading change is needed
D. Capability plots show worst-case values only — the vessel can hold in 24 knots from any direction regardless of the plot asymmetry
Sign in or create a free account to see the answer and explanation.
A. The ASOG translates general vessel DP capability into specific, agreed criteria for a particular operation and worksite — weather limits, reference system minimums, thruster requirements, and alert zones. It is developed jointly by the vessel operator and the client/installation authority for each specific operation
B. The ASOG sets the DPO's watch schedule and handover procedures and is produced by the master alone
C. The ASOG is the same as the DP Consequence Analysis test and is produced by the DP system automatically before each operation
D. The ASOG is a standard document issued by IMCA that applies to all DP vessels equally and requires no vessel-specific customisation
Sign in or create a free account to see the answer and explanation.
A. The colour system refers to the number of active thrusters — green is all thrusters working, yellow is one thruster failed, red is two thrusters failed
B. Green/Yellow/Red refers to the sea state only — green is calm, yellow is moderate, red is severe
C. Green/Yellow/Red is a client-specific system used only on drilling vessels and does not apply to construction or diving support vessels
D. Green means operations can continue normally within all ASOG limits; Yellow means a limiting parameter has been reached or a degradation has occurred and the DPO must assess whether to continue — typically with master informed; Red means the abort criteria have been met and operations must stop or disconnect immediately
Sign in or create a free account to see the answer and explanation.
+17 more DP — Operations questions available