A DPO is six hours into a twelve-hour DP watch on a cable-lay vessel. Conditions have been perfect all watch — flat calm, three good references, all systems green, no alarms. The DPO begins browsing the internet on a personal device to pass the time. What human factor is operating here, and what is the specific risk it creates in DP watchkeeping?
A. The DPO should use quiet periods for paperwork — productive use of downtime is more valuable than passive monitoring
B. Boredom is an acceptable state during calm DP watches — the automated system manages everything and the DPO is there as a backup
C. Extended uneventful periods create the highest complacency risk in DP watchkeeping: the DPO's vigilance degrades precisely because nothing has demanded it. When a fault develops — a reference dropout, a thruster fluctuation, a slow position drift — the response time increases because the DPO's attention is elsewhere. Long periods of routine are when the first small signals of developing problems are most likely to be missed
D. The risk is limited to DP Class 1 vessels — DP2 and DP3 systems have sufficient automated monitoring to compensate for reduced DPO attention during quiet periods
Sign in or create a free account to see the answer and explanation.
A. The concern is only valid if a client representative is present on the bridge during the exceedance
B. The lead DPO is correct — if the vessel has held position every time, the limit was probably set too conservatively and can be informally adjusted upward
C. Repeated limit exceedance without incident is the definition of normalisation of deviance — each incident-free violation makes the next seem safer, eroding the original safety margin without any formal review. The ASOG limit exists because someone calculated the risk; overriding it verbally on the basis that "nothing happened" removes the agreed safety envelope without authorisation
D. The ASOG yellow limit is a guideline, not a hard limit — the DPO has discretion to continue past yellow if conditions feel manageable
Sign in or create a free account to see the answer and explanation.
A. Plan continuation bias — the cognitive tendency to continue toward a goal because of the investment already made, even when conditions indicate stopping. It is particularly dangerous because the "sunk cost" of 11 hours of work is irrelevant to the safety calculation for the next 40 minutes. Those 40 minutes will be conducted in degrading conditions with a deteriorating safety margin, not in the conditions the plan was designed for
B. The dive supervisor's view is correct as long as the master agrees to the extension in writing
C. The dive supervisor is exhibiting reasonable commercial risk management — 40 minutes is a calculated gamble worth taking given the investment already made
D. This is an authority gradient issue, not plan continuation bias — the dive supervisor is simply trying to override the DPO's authority
Sign in or create a free account to see the answer and explanation.