During pre-operation checks on a DP2 cable-lay vessel, one of three online generators trips offline and cannot be restarted immediately. The remaining two generators are running within normal load limits. The lead DPO must decide whether DP operations can continue. What is the key question the DPO must answer before continuing DP2 operations?
A. Whether the tripped generator can be restarted within 30 minutes
B. Whether the client has been informed of the generator fault
C. Whether the two remaining generators are sufficient to power all thrusters at maximum demand after the WCF
D. Whether a third generator being offline is within the vessel's normal operational profile
Sign in or create a free account to see the answer and explanation.
A. The vessel can maintain position after any failure, including fire or flooding in a single compartment
B. No guarantee of position holding — DP Class 2 only requires a backup mode to be available
C. The vessel can maintain position after a single failure of any active component or system, provided redundant systems are in place and operational
D. The vessel can maintain position only if the failure occurs in an external reference system
Sign in or create a free account to see the answer and explanation.
A. DP3 requires redundant systems to be located in separate watertight compartments with physical separation, such that a single fire or flood cannot affect both systems simultaneously
B. DP3 requires full redundancy in all active components, identical to DP2 but with an additional manual backup mode
C. DP3 applies only to semi-submersibles and is not relevant to monohull vessels
D. DP3 requires three independent DP control systems operating in parallel at all times
Sign in or create a free account to see the answer and explanation.
+17 more DP — Fundamentals questions available
Create a free account to practise all 20 questions, track your accuracy, and build your Reputation Score.
Create Free Account