The riser angle readout on a drillship DP console begins moving toward the yellow (advisory) limit. The OIM calls the bridge and asks the DPO to hold position "for another 15 minutes" while the driller completes a critical pipe joint. What should the DPO do?

A. Advise the OIM of the riser angle trend and that yellow is approaching; the DPO cannot agree to "hold for 15 minutes" without qualification — if the angle reaches the WSOG red threshold, the disconnect will be initiated regardless of where the driller is in their sequence; the OIM must decide whether to accept a disconnect risk or interrupt the drilling
B. Switch to joystick mode and manually steer the vessel back over the wellhead to reduce the angle
C. Comply — the OIM has authority over the drilling schedule
D. Initiate the LMRP disconnect immediately when yellow is reached, without informing the OIM first
Sign in or create a free account to see the answer and explanation.
What is an LMRP disconnect and when is it triggered during a drillship DP operation?
A. An LMRP disconnect occurs automatically whenever the DP system goes to joystick mode
B. The LMRP is only disconnected when drilling operations are completed for the well
C. An LMRP (Lower Marine Riser Package) disconnect is an emergency separation of the riser/BOP stack at the connector below the BOP, triggered when the vessel cannot hold position adequately to prevent riser overstress or when a drive-off/drift-off puts the riser beyond its angular tolerance — it disconnects the vessel from the wellhead before the riser is damaged or pulls the BOP off the wellhead
D. An LMRP disconnect is a planned daily procedure carried out to inspect the BOP
Sign in or create a free account to see the answer and explanation.
What do the riser angle limit colour zones (green, yellow, red) represent on a drillship DP operation?
A. The colour zones represent thruster availability: green = all thrusters online, yellow = one thruster offline, red = two or more offline
B. Green = normal operating range (riser within safe angular limits); Yellow = advisory — riser angle approaching limits, increased monitoring required; Red = riser angle at or beyond limits — LMRP disconnect must be initiated; these limits are defined in the WSOG for the specific well and riser configuration
C. Red means the riser is fully vertical; green means it is at its maximum angle
D. The colours indicate weather severity, not riser angle
Sign in or create a free account to see the answer and explanation.
+7 more DP — Drillship / MODU questions available

Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.

Create Free Account