During a crane slewing operation with a 40-tonne load, a generator trips and the DP system goes to degraded mode. The crane is mid-slew. What should the DPO and crane operator do?

A. Continue the slew — the crane operation has priority and should not be interrupted
B. Switch to manual propulsion and maintain position while the crane completes its slew
C. DPO immediately alerts the crane operator to stop slewing and hold position; DPO assesses new DP capability with reduced power and compares against current environmental conditions using the ASOG; crane operator should arrest the slew and hold the load stationary to prevent additional pendulation forces until the DP situation is stabilised
D. The crane operator should lower the load to deck immediately regardless of what is below it
Sign in or create a free account to see the answer and explanation.
How does a heavy crane lift affect the DP system's position-keeping model and why does this matter?
A. Crane lifts only matter for DP if the load exceeds the vessel's Safe Working Load
B. Lifting a heavy load shifts the vessel's centre of gravity upward and athwartships (depending on crane position), altering the vessel's roll and pitch characteristics and therefore the environmental force response — a DP system not updated with the correct crane position and load may miscalculate the forces needed to maintain position, reducing accuracy
C. Crane lifts have no effect on the DP model — only weather forces are modelled
D. The DP system automatically compensates for crane loads through the load cell feedback
Sign in or create a free account to see the answer and explanation.
What is load pendulation and why does it create a risk for DP position-keeping?
A. Pendulation is the rotation of the crane jib, not the load
B. Pendulation has no effect on DP — it is a rigging safety concern only
C. Load pendulation is the swinging of a suspended load in an arc below the crane hook, which creates a dynamic, oscillating side force transmitted through the crane structure to the vessel hull — the DP system must counter this cyclic force, and the constant changing direction of the force can cause oscillating thruster demands that stress both the DP system and the power management system
D. Pendulation only occurs when the load is in the water, not when suspended in air
Sign in or create a free account to see the answer and explanation.