Maritime QuestionsDP — Crane Operations

A DPO notices the vessel starting to drift off position during a 50-tonne crane lift with the load 30 metres off the deck over the vessel's side. What is the priority order for actions?

A. Immediately alert the crane operator to stop slewing or jib movement (to prevent pendulation worsening); assess whether the drift is controlled (DP working hard) or uncontrolled (excursion); maintain or increase thrust to arrest drift before alerting client/structure; only initiate ASOG decision if drift reaches amber limit — do not drop the load without direct emergency cause
B. Switch to joystick and drive the vessel back to position regardless of crane status
C. Call the Master before taking any action
D. Immediately release the crane load to reduce the heeling moment and restore position-keeping capability
Sign in or create a free account to see the answer and explanation.
How does a heavy crane lift affect the DP system's position-keeping model and why does this matter?
A. Crane lifts only matter for DP if the load exceeds the vessel's Safe Working Load
B. Lifting a heavy load shifts the vessel's centre of gravity upward and athwartships (depending on crane position), altering the vessel's roll and pitch characteristics and therefore the environmental force response — a DP system not updated with the correct crane position and load may miscalculate the forces needed to maintain position, reducing accuracy
C. Crane lifts have no effect on the DP model — only weather forces are modelled
D. The DP system automatically compensates for crane loads through the load cell feedback
Sign in or create a free account to see the answer and explanation.
What is load pendulation and why does it create a risk for DP position-keeping?
A. Pendulation is the rotation of the crane jib, not the load
B. Pendulation has no effect on DP — it is a rigging safety concern only
C. Load pendulation is the swinging of a suspended load in an arc below the crane hook, which creates a dynamic, oscillating side force transmitted through the crane structure to the vessel hull — the DP system must counter this cyclic force, and the constant changing direction of the force can cause oscillating thruster demands that stress both the DP system and the power management system
D. Pendulation only occurs when the load is in the water, not when suspended in air
Sign in or create a free account to see the answer and explanation.