Maritime Questions › DP — Control System Failure (Cascade)
What should the closing report on this event specifically capture, beyond "fault occurred, patch applied, resolved"?
A. Just the patch version number, with no further narrative needed
B. The fact that a control-system/software fault, a degraded UPS, and an unpatched known bug were all present simultaneously — three separate weaknesses that happened to combine on this occasion without causing a position excursion; the report should flag this as a near-miss combination worth wider distribution, including to other vessels in the fleet running the same DP system version
C. Nothing further, since the visible symptom (the changeover) ultimately worked as designed
D. Only an internal note, since the issue did not involve any external party such as a classification society
Sign in or create a free account to see the answer and explanation.
A. The vessel should immediately drop anchor regardless of changeover success
B. The system should automatically switch over to DP Computer 2 (the standby/redundant controller) seamlessly, with thrusters continuing under DP2's control without interruption; the DPO must verify the changeover actually occurred cleanly, that DP2 has correct position and reference data, and that no thruster commands were lost or duplicated during the transition
C. No automatic action occurs for a software fault; only hardware faults trigger changeover
D. Thrusters automatically default to maximum power output until manually reset
Sign in or create a free account to see the answer and explanation.
A. This is a control-system/software failure category, distinct from power generation or sensor failures — correctly identifying the category matters because the troubleshooting, the people who need to be involved (DP system OEM/software support, not just the electrical engineer), and the appropriate caution around trusting the "recovered" system are all different from a power or sensor event
B. It must be a sensor fault since thrust is downstream of position data
C. The category does not matter — all DP failures are addressed identically regardless of cause
D. It must be a power generation fault since any thrust transient implies an electrical issue
Sign in or create a free account to see the answer and explanation.
+7 more DP — Control System Failure (Cascade) questions available
Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.