Maritime QuestionsCargo & Stability

As Chief Officer, what would you expect to find in your vessel's Cargo Securing Manual (CSM), and why is it important?

A. Only a copy of the load line certificate, since cargo securing is governed entirely by that certificate
B. A blank template only, to be completed entirely by the cargo surveyor at each port with no pre-approved content
C. Approved standard and non-standard cargo securing arrangements for the types of cargo carried, including the maximum securing loads (MSL) of lashing points, lashing equipment and patterns, permissible stack weights/heights, and guidance for assessing forces on cargo in various sea conditions, all approved by the flag State or its recognised organisation and required to be carried on cargo ships under SOLAS Chapter VI/VII
D. A general record of all crew training certificates, unrelated to cargo operations
Sign in or create a free account to see the answer and explanation.
The yacht is loading additional stores and fuel before a long passage, raising the displacement significantly. What effect does this have on stability that you, as OOW, should be aware of?
A. Only the Chief Engineer needs to consider this, never the deck watchkeeper
B. None — stability is fixed regardless of loading
C. Increased displacement generally raises the centre of gravity if weight is added high up, and free surface effects in partially-filled tanks can reduce the effective metacentric height (GM)
D. Additional weight always improves stability regardless of where it is placed
Sign in or create a free account to see the answer and explanation.
During a survey, watertight door seals in a transverse bulkhead below the waterline are found to be perished and not closing properly. As Master, what is the significance of this for the vessel's damage stability?
A. This only matters when the vessel is at anchor
B. Negligible — watertight doors below the waterline are rarely closed anyway
C. Only relevant if the vessel carries passengers
D. Significant — a failed watertight closure compromises the subdivision the vessel's damage stability calculations rely on, potentially allowing progressive flooding between compartments in the event of damage
Sign in or create a free account to see the answer and explanation.
+177 more Cargo & Stability questions available

Create a free account to practise all 180 questions, track your accuracy, and build your Reputation Score.

Create Free Account