Maritime QuestionsCargo & Stability

In BSafe Case Study 24, the fumigation contractors carried a phosphine gas detector before entering the corn cargo hold. Why didn't it prevent the fatality?

A. The detector was faulty
B. The hazard was oxygen depletion from the cargo itself, not phosphine gas, so the detector wasn't measuring the actual danger present
C. The detector was left on deck by mistake
D. Phosphine had already been applied before they entered
Sign in or create a free account to see the answer and explanation.
The yacht is loading additional stores and fuel before a long passage, raising the displacement significantly. What effect does this have on stability that you, as OOW, should be aware of?
A. Only the Chief Engineer needs to consider this, never the deck watchkeeper
B. None — stability is fixed regardless of loading
C. Increased displacement generally raises the centre of gravity if weight is added high up, and free surface effects in partially-filled tanks can reduce the effective metacentric height (GM)
D. Additional weight always improves stability regardless of where it is placed
Sign in or create a free account to see the answer and explanation.
During a survey, watertight door seals in a transverse bulkhead below the waterline are found to be perished and not closing properly. As Master, what is the significance of this for the vessel's damage stability?
A. This only matters when the vessel is at anchor
B. Negligible — watertight doors below the waterline are rarely closed anyway
C. Only relevant if the vessel carries passengers
D. Significant — a failed watertight closure compromises the subdivision the vessel's damage stability calculations rely on, potentially allowing progressive flooding between compartments in the event of damage
Sign in or create a free account to see the answer and explanation.
+225 more Cargo & Stability questions available

Create a free account to practise all 228 questions, track your accuracy, and build your Reputation Score.

Create Free Account