Maritime Questions › Bwms Operations
What change is the IMO Correspondence Group working toward in Section 3.2 of the BWMS Code, and at what MEPC session is finalisation targeted?
A. Amending the definition so that 'ballast water system' means the BWMS AND the ship's ballast water fittings (piping, valves, pumps etc.) that would be required even without a BWMS fitted — with remaining amendments targeted for finalisation at MEPC 85, followed by a progress/written report process through MEPC 86
B. Removing all bypass provisions from the Code entirely with immediate effect
C. Replacing the BWMS Code with a voluntary industry standard with no IMO oversight
D. Extending the BWMS Code to apply only to newbuilds delivered after 2030
Sign in or create a free account to see the answer and explanation.
A. The piping arrangement may permit the ballast water management system to be bypassed during ballast uptake and discharge operations without activating an alarm
B. BWMS units are failing to achieve the required treatment efficacy under testing
C. Crew are not trained to operate the BWMS control panel
D. Ballast water record books are not being completed in the correct language
Sign in or create a free account to see the answer and explanation.
A. It must be connected to the BWMS so that any bypass activates an alarm, and the bypass event must be recorded both by the control/monitoring equipment and in the Ballast Water Record Book
B. It must be sealed shut and require a class surveyor's authorisation to open under any circumstances
C. It may bypass the system silently provided the Master verbally informs the Chief Engineer
D. It is only required to be logged if used more than once per voyage
Sign in or create a free account to see the answer and explanation.
+5 more Bwms Operations questions available
Create a free account to practise all 8 questions, track your accuracy, and build your Reputation Score.
Create Free Account