DP Errors: Position References That Failed Together
Part of the Dynamic Positioning Incidents & Lessons series.
Error type: A hidden common failure: several position references lost at once because they were not independent
Cases compared: DP shuttle tanker gyro heading loss (SF 09/08), DP Class 2 run-off alongside a platform (SF 14/06), DPE 04/21 DGNSS and gyro configuration
Use it for: DPO orals and induction, FMEA and ASOG review, DP annual trials, technical superintendents
Sources: IMCA Safety Flash 09/08; IMCA Safety Flash 14/06; IMCA DP Event bulletin DPE 04/21 (anonymised industry reports)
Redundancy on Paper, Common Failure in the Wiring
A DP vessel is judged on its ability to lose one thing and carry on. These three IMCA reports each describe a vessel that had several position references selected into DP, and lost them together. In none of them did the operators do anything obviously wrong. The failure was in how the references were connected, configured or documented.
The Cases
DP Class 2 shuttle tanker, loss of all references during offtake (IMCA SF 09/08)
A DP Class 2 shuttle tanker lost its position during a DP offtake operation, through the sudden and simultaneous loss of all position reference systems.
- What the team did: The operators were conducting a normal DP offtake with references online.
- The specific error: IMCA's report says investigation found the loss of reference systems was directly caused by incorrect gyro heading, which corrupted all the offset calculations in the DP model. The root cause was erroneous GPS signals reaching all the gyros over a short period of time.
- The barrier that would have caught it: Stricter criteria for accepting position references into the DP system, which the operator put in place, and gyro software to reject erroneous GPS latitude and speed compensation data, which the manufacturer was about to provide.
DP Class 2 vessel alongside a platform, run-off (IMCA SF 14/06)
A DP Class 2 vessel alongside a platform lost its reference systems and was taken into manual control. She was recovered to a safe location without mishap, with no damage to the platform or vessel.
- What the team did: One position reference started to deteriorate. The DPO on watch selected alternative references to maintain positional integrity, in line with normal accepted procedure.
- The specific error: The vessel's configuration linked the faulty reference to several others, so losing one lost the others, including a vertical reference unit. The DP voting algorithm was based on three vertical reference units, but only two were fitted, so the second was rejected and then all other references were rejected. Sensor offsets to the centre of gravity were omitted, and pitch compensation wiring errors amplified pitch rather than compensating for it. These changes were poorly documented.
- The barrier that would have caught it: Configuration checks that go beyond function: IMCA noted that FMEA trials test function, not configuration, and may miss such errors, especially if carried out in calm water. Keep up-to-date records of configurations, offsets, drawings and changes on board.
Vessel on ROV operations, North Sea, DGNSS and gyro configuration (IMCA DPE 04/21)
A vessel conducting ROV operations in open water in the North Sea, with four DGNSS and two hydro-acoustic references selected into DP, lost DGNSS 2 and 3, then DGNSS 1 and 4 and gyros 1 and 2, then both hydro-acoustic references, and was positioning on the model. Sea state was around four metres and the potential risk of a fast drift-off was high. The ROV was recovered and a yellow DP alert was activated. No damage occurred.
- What the team did: The vessel was believed to be configured as in the ASOG, with an open bus 2-way split and four thrusters in DP.
- The specific error: All four DGNSS correction modules were locked on a single correction source, which failed for 1 hour 3 minutes. Gyros 1 and 2 took automatic latitude and speed updates from the DGNSS and failed all outputs when the signal was lost. During a hydro-acoustic calibration by the survey team, both hydro-acoustic systems had been connected to gyros 1 and 2 instead of gyros 3 and 4, which used manual inputs. Nobody wrote down or told the DPOs about that change.
- The barrier that would have caught it: A handover note whenever the configuration changes, a topology the DPOs understand, checklists that ask whether the DGNSS share a correction source, and manual latitude and speed input to the gyros, as IMCA M 252 recommends.
What the Three Cases Have in Common
- The references were not independent. One gyro heading, one correction source, one voting setting.
- The configuration was not what the watch believed. A calibration change, an omitted offset, a three-unit voting assumption.
- The checks tested function, not configuration. FMEA trials and checklists did not ask the question.
A Reference Independence Checklist
- Draw the topology: which gyro feeds which reference, which DGNSS share a correction source, which sensors feed the VRS voting.
- Enter latitude and speed into gyros manually, unless a documented reason says otherwise.
- After any calibration, survey or maintenance that touches DP inputs, restore the fault-tolerant configuration and tell the DPO in writing.
- Check that the number of sensors the DP system expects matches the number installed.
- Run FMEA trials and annual checks in conditions that expose configuration errors, and keep the records on board.
Test Your Knowledge
Six questions on these cases are linked from this page in the Knowledge Checker.
Related Reading
What Would You Do?
This report has been turned into rank-tagged "what if" questions in Crew Connect's free Knowledge Checker. Create a free profile to test your judgement against this scenario.
Create Free Profile & Try Incident Case ReviewCould You Have Prevented It?
Test your judgement in Crew Connect's Decision Simulator — real incident patterns, real consequences, free to try.
Try the Decision Simulator Free →Ready to advance your maritime career?
Free verified profile. Certificate tracking. Get found directly by shipping companies — no crewing agent, no placement fees.
Create Free Profile — 60 SecondsBrowse maritime jobs by rank & sector