Part of the Dynamic Positioning Incidents & Lessons series.

Error type: Staying on DP when the signs said to stop: unstable references, alarms not read, an ASOG limit changed
Cases compared: DPE 01/25 (supply vessel under a crane), DPE 03/24 (supply vessel on the lee side)
Use it for: DPO orals, ASOG briefing, stop-work authority, alarm management, cargo operations alongside installations
Sources: IMCA DP Event bulletins DPE 01/25 (“How is your alignment?”) and DPE 03/24 (“There, but not really there”)

30 min+ DGNSS 1 and 2 unstable before the vessel lost position under the crane2 m vs 3 m position limit written in the ASOG against the limit that was set5 m prediction error limit exceeded when a wave train pushed the vessel out of position

When the Margin Is Spent Before the Alarm

Both of these were DP Class 2 supply vessels working close to a larger vessel or installation, with three or four position references online. In both, small warnings were accepted. In one, the ASOG position limit had been widened. In the other, the DPO did not see the alarm that mattered, because the screen only showed one line at a time.

The Cases

DPE 01/25: supply vessel under a construction vessel's crane

A supply vessel was working cargo alongside a construction vessel with both generators running and connected, all six thrusters selected to DP, and two DGNSS and a laser-based CyScan selected. She entered her position under the crane at 16:55. From 17:54 she began to lose position references, with frequent instability of the two DGNSS. A container lift obstructed the line of sight between the CyScan on the supply vessel and the reflector on the construction vessel. The vessel then began to lose position, moving toward the construction vessel.

  • What the team did: The DPO selected joystick first, but the system needed to synchronise, and during that time the vessel was moving towards the construction vessel and risked collision. He then tried manual control, which is a two-step action: the first attempt failed, the second succeeded, and he pulled the vessel clear.
  • The specific error: IMCA's findings: stop-work authority was not exercised when the vessel started intermittently losing references; the CyScan reflector position was not considered for the operation; DGPS 1 and 2 had been unstable for over 30 minutes; multiple small position movements had already occurred; and the ASOG position limit was 2 m but was set to 3 m.
  • The barrier that would have caught it: Stop at the first intermittent loss and move to a clear position to investigate, which the ASOG required. Check reflector line of sight against the lift path before starting cargo. Rehearse the manual-control sequence so it works first time.

DPE 03/24: supply vessel on the lee side in heavy swell

A supply vessel was working cargo alongside an installation on the lee side, in the drift-off position, with two DGNSS, a radar-based and a laser-based reference accepted. Swell was 3.2 m and wind about 28 knots. She had been having position excursions of 3 to 5 m and heading drops of 3 to 5 degrees, which the Master and DPOs considered acceptable because she was on the drift-off side. At 10:08 position and heading deteriorated by about 2 m and 2 degrees, out-of-limit warnings were generated and prediction error alarms appeared for each reference in a couple of seconds.