Bridge Errors: Plan Continuation and the Challenge That Never Came

🕑 5 min read words Safety • Incident

Error type: Plan continuation, unauthorised deviation, and failure to challenge across an authority gradient
Cases compared: Costa Concordia (2012), El Faro (2015), Wakashio (2020), Caledonian Sky (2017)
Use it for: MCA orals (BRM, challenge and response, Master's standing orders, command responsibility), team-leadership assessments
Sources: Italian Ministry of Infrastructure and Transport (Costa Concordia); NTSB/MAR-17/01 (El Faro); Panama Maritime Authority (Wakashio); BMA report (Caledonian Sky)

32 people died on Costa Concordia after a deviation from the approved passage plan12 h age of the forecast package El Faro’s plan still relied on1.5 NM from shore and closing when Wakashio’s Master had still not assumed command

Seeing It Is Not the Same as Saying It

A bridge team that notices a problem but does not convert it into a clear, spoken challenge has not caught anything. In each of these four cases someone on the bridge, or ashore, had the information or the instinct. The Master had the authority to override it, and nobody forced the issue.

Plan continuation bias is the other half. A plan made early, with less information, feels like a decision already taken. Changing it needs a deliberate act. Hedging language, silence and deference make that act less likely.

The Cases

Costa Concordia, Isola del Giglio, 13 January 2012

On the evening of 13 January 2012 the Master made an unauthorised deviation from the approved passage plan to sail close to Isola del Giglio so the ship could be seen from shore, at 16 knots. The ship struck Scole Rocks and a 53 m gash opened across five watertight compartments. The ship was designed to survive two. She capsized on her side. Thirty-two people died.

  • What the bridge team did: The deviation was not charted, risk-assessed or briefed to the bridge team, and was carried out with a full bridge team present. A helm order given during the manoeuvre was misunderstood by the helmsman, who steered in the opposite direction. After the impact the situation was described as an electrical fault, and the general emergency alarm and abandon-ship order were delayed well over an hour.
  • The specific error: The Italian investigation concluded that the human element was the root cause, twice over: the unconventional manoeuvre, and the delayed, understated response. No one on the bridge stopped the deviation. The Master later left the ship while passengers and crew remained aboard, and did not return when ordered to by the Coast Guard.
  • The barrier that would have caught it: No deviation without a risk assessment, chart preparation and a full bridge team briefing. A structured BRM process that gives subordinate officers an unambiguous way to challenge the Master. An honest and immediate declaration of the true severity after impact.

Full case: Costa Concordia: the Giglio grounding.

El Faro, Hurricane Joaquin, 1 October 2015

El Faro sailed from Jacksonville for San Juan on 29 September 2015 as Hurricane Joaquin developed. She lost propulsion and took on water, and sank. All 33 crew died.

  • What the bridge team did: The Captain planned the route on a forecast that projected the storm turning north before the Bahamas, and held to it as the information aged to roughly 12 hours old. Officers on watch raised the option of diverting west through the Old Bahamas Channel, but the VDR audio shows their concern expressed in hedging, indirect language rather than direct challenge. The Captain did not change course.
  • The specific error: The NTSB concluded that the sinking was caused by the Captain’s failure to avoid sailing into a hurricane despite numerous opportunities to route away. Contributing factors included the use of non-current weather information, a late decision to muster the crew, ineffective bridge resource management, and inadequate oversight by the operator.
  • The barrier that would have caught it: A direct, unhedged statement of concern with a clear alternative. A check of the age of any forecast before routing on it. A company that actively oversees routing near severe weather instead of leaving it to the Master underway.

Full case: El Faro: Hurricane Joaquin.

Wakashio, Pointe d’Esny, Mauritius, 25 July 2020

The capesize bulk carrier Wakashio, in ballast, grounded on a reef off Pointe d’Esny, Mauritius, about 900 m from shore. Oil began leaking 12 days later. About 1,000 tonnes of low-sulphur fuel oil were spilled and the ship broke in two on 15 August.

  • What the bridge team did: The Master had attended a crew birthday party and consumed four alcoholic drinks, two at the party and two more on the bridge. He deliberately sailed close to the Mauritius coast to get a mobile phone signal, entering territorial waters without notifying the authorities. The Chief Officer was also preoccupied with getting mobile internet. A cadet was allowed to skip lookout duty to stay at the party.
  • The specific error: The Panama Maritime Authority found the grounding was most probably a result of human factor. At 1.5 miles from shore and closing the Master still had not assumed command as required. The ship had no large-scale charts on board and the bridge relied on an over-zoomed electronic chart display that looked fine at the zoom level in use.
  • The barrier that would have caught it: A team that stops a deviation made for personal reasons, a Master who is fit for duty, a lookout, large-scale charts and a display set to a zoom level that shows the danger.

Full case: Wakashio: grounding and oil spill.